Shepparton Aquatic Centre
Client: Greater Shepparton City Council
Completion: TBA
Complete refurbishment indoor 25 mt pool. Demolition, rectification of walls and floors and reinstalment of complete membrane and tiled fitout, supply of fixtures, plumbing and electrical work. With the centre remaining open, the pool was completely hoarded and protected from the general public, a complete reinforced substrate to the pool floor allowing for longevity and our system was installed, an overall success the client was extremely pleased with the result.